Your time is money.

Save time and money
through prefabrication.

6-8 Average Panels
Installed Per Day
Watch Video
0 DAYS LOST FROM
ON-SITE WEATHER
DELAYS
2,100-2,900 SF OF PANELS INSTALLED PER DAY
*Assuming 12' x 30' panel sizes

Explore some of our most
popular panel options.

6 vs. 30 WORKERS
Average manpower of prefab panels
compared to conventional methods

Prefab Metal Panel System

View Panel Details

Metal panel construction at a lower cost, with StoGuard waterproof air barrier and exterior insulation standard.

Back to Intro

Prefab EIFS Panel System

View Panel Details

Metal panel construction at a lower cost, with StoGuard waterproof air barrier and exterior insulation standard.

Back to Intro

Experience an exciting new world of prefab.

By the numbers

Compressing the Construction Schedule

Panels to date and counting
0
Total SF of panels and counting
0
Building envelope installation time savings
0 %
Employees on-site for prefab exterior skin versus conventional construction methods
0  vs 30
Production day delays from on-site weather
0  days
On-site lay down/storage needed
0  SF
Area of skin fabricated in a factory environment
0 %
Area of skin QAQC'd
0 %

Featured Projects

Conception to Completion Roadmap

1 2 3 2 3 4 4 Early Involvement Early Review Panel Creation Installation Early Collaboration: early involvement starts with a feasibility review of the project. We will take the provided model and assess the project for prefabrication opportunities. This is most efficient when done at the SD or DD phase of documents. Once reviewed, panel breaks can be created and deeper detail is analyzed to vet proper support, dimensions, and details. This is typically done at the DD phase. CFMF shop drawings are incorporated, fabrication tickets are created, trailer load schedules are built, and in-house fabrication occurs prior to shipment and panel installation. Panels are loaded on trailers and shipped to the jobsite for ‘just in time’ delivery. Panels are set in-place and installed by the BakerTriangle team.
Stages of Panel Production

Our streamlined process allows you to take full control over your project from assembly to install.

WATCH VIDEO Stud Framing 01

WATCH VIDEO Sheathing 02

WATCH VIDEO Air Weather Barrier 03

WATCH VIDEO Continuous Insulation 04

WATCH VIDEO Exterior Finishes 05

WATCH VIDEO Glazing 06

WATCH VIDEO Loading & Shipping 07

WATCH VIDEO Install 08

StoPanel Brick ci is a lightweight, energy efficient pre-fabricated exterior wall panel with a continuous air & moisture barrier, exterior insulation as an option and a variety of thin veneers, such as thin brick; all at a fraction of the weight of conventional thick brick/or other thick veneers. Download Data Sheet Metal panel construction at a lower cost, with StoGuard waterproof air barrier and exterior insulation standard. Download Data Sheet This lightweight prefabricated panel is both energy efficient and durable, with continuous insulation and StoGuard waterproof air barrier standard. Versatile Sto Finishes allow for almost any design aesthetic. Download Data Sheet StoPanel Backup is the starting point for all StoPanel cladding options. Consisting of cold formed steel, glass-mat faced gypsum sheathing and StoGuard air & moisture barrier; StoPanel Backup is the backbone of StoPanel Technology. Download Data Sheet
Types of Panels